SYDNEY, AUSTRALIA--(Marketwired - Nov. 16, 2015) - Intrepid Mines Limited (ASX:IAU) ("Intrepid" or the "Company") is pleased to provide an update on drilling at the Mumbwa Project in west-central Zambia. Assays from drilling on Target H have delivered further encouraging results. Results from Kantonga, Kitumba and Target J are also presented here. Highlights from Target H HDD_004 include: 51 metres at 0.91% copper and 0.32 g/t gold from 229 metres including: 23 metres at 1.60% copper and 0.58 g/t gold from 233 metres 20 metres at 0.48% copper and 0.21 g/t gold from 308 metres. 4 rigs, 3 diamond rigs and RC rig, are currently operating with approximately 10,700 metres of drilling having been...
↧